The Goal: Extend the life of
helicopter rotors and save $millions

The Challenge


HTSI hired FAA-certified principal engineer Dave McClenahan to oversee the testing and analysis. Dave hired engineer Dick Meridith to attach strain gages to the air frame and rotor and collect data during as a helicopter was put through its paces. A consultant was enlisted to write the collection program, which he promised to do while on a vacation from his day job. The vacation ended and there was no working program and time was running out, so Dick asked National Instruments what he should do. After a call to Moore Good Ideas (MGI), David Moore was on a plane the next day.

 

Forward to "The Issues"